Projects

Structural Steelwork
Pelican Park

Project – All steelwork and air-conditioning vents cleaned above and indoor swimming pool.

Method of Work – Hi-Glaze were contracted to carry out this project with a 2 day time limit.

Due to limited access for machinery of any substantial size, the project involved  Aid Climbing techniques  over the swimming pool. The work was carried out effectively, on time and safely to our clients satisfaction.

 

 

Dome Cleaning
Latrobe University

Project – External wash down of a retractable dome

Method of Work – Works carried out involved a specialised rope access technique running between 2 adjoining buildings to allow technicians to perform required work.

The task involved the removal of of existing staining to the Dome via scrubbing and pressure washing . The client was extremely surprised by the result as they had previously been informed that this task could not be carried out.

 

© Copyright 2008 All Rights Reserved Hi-Glaze Window Cleaning

Hi-Glaze Window Cleaning Pty Ltd
28 Blackburn Road, Mooroolbark Vic 3138
Tel: 03 9726 4858 - Mobile: 0418 173 335 - Fax: 03 9726 4727
www.higlazewindowcleaning.com.au

Designed by: Websites 4 Small Business